Welcome to our Store
Search
Crimp connector Thimble battery terminal connector 100 Pieces
Rs 840
ZSNE-3000 Series Temperature Controller in Pakistan
Rs 3,500
ZSND-1000 Temperature Controller in Pakistan
Rs 2,600
Rs 1,920
-27%
ZL-7801A Mini Multifunction Automatic Incubator Controller in Pakistan
Rs 4,725
ZL-6290A Celsius Fahrenheit in Pakistan
Rs 4,500
Rs 4,410
-2%
View All
0
0
SHOP BY CATEGORY
Product Category
Home
HOT ITEM
Oven Parts
CHINT
Tomzn
سستا مال
Home
BEST SELLING
Long Lead-Acid Battery 12V 1.2AH
Long nose pliers Ingco HLNP08168 in Pakistan
Back to BEST SELLING
Loctite 55 Pipe Sealing Cord in Pakistan
Product Categories
Instruments and Tools
(258)
Clamp Meter
(31)
Thimble Press Tools
(2)
Sencan Power Tools
(72)
INGCO Tools
(1779)
TOTAL Tools
(19)
Makute Tools
(0)
Power Tools
(118)
Hole Saw
(29)
Cutting Tools
(67)
PPE Personal Protective Equipment's
(0)
Welding
(37)
Measuring Instruments and Tools
(258)
Electric Panel
(104)
Line up
(7)
Led Light
(16)
PG Glands
(14)
Fuse
(58)
Phase Failure Relay
(49)
Change Over
(18)
Terminal Block / Connector
(11)
Circuit Breaker
(124)
Selector switch
(39)
lugs
(11)
voltage protector
(39)
Panel BOX
(31)
Electric Panel Meter
(34)
Cabinet Door Lock
(12)
HMI & PLCs
(66)
PLC
(24)
HMI
(10)
PLC Cables
(24)
PLC Programming Cable
(24)
HMI programming cable
(0)
HMI & PLC Modules
(0)
-12%
Sold out
Long Lead-Acid Battery 12V 1.2AH
Rs 1,550
Rs 1,375
SKU:
BR6033
N/A
Availability :
In Stock
In Stock
Out of stock
Out of stock
Add to Wishlist
Notify me when this product is available:
Email address
*
Your Message
Please notify me when Long Lead-Acid Battery 12V 1.2AH becomes available - https://industryparts.pk/products/long-lead-acid-battery-12v-1-2ah
Share on Facebook
Share on Twitter
Share on Pinterest
Share on WhatsApp
Description
Reviews
Delivery Areas
Description
Rechargeable Sealed Lead Acid Battery. LONG WP1.2-12T, 12V, 1.2AH Made in Vietnam
Reviews
Delivery Areas
Sunday,Monday,Tuesday,Wednesday,Thursday,Friday,Saturday
January,February,March,April,May,June,July,August,September,October,November,December
Not enough items available. Only [max] left.
Add to Wishlist
Browse Wishlist
Remove Wishlist
Shopping cart
Your cart is empty.
Return To Shop
Enable cookies to use the shopping cart
Add Order Note
Edit Order Note
Add Order Note
Edit Order Note